Forthcoming roadworks
Cressing Road roundabout at Garden Centre and bend on B1018 by Persimmon development 21 Apr 20:00 – 30 Apr 06:00 – Works are being undertaken on the highway by a third party organisation. Traffic control (two-way signals)
Jeffreys Road close to junction with B1018 : 3 Jul – 4 Jul – Essex Highways are undertaking works to the roadside gully at this location. Traffic control (two-way signals)
Braintree Road (1) close to Cressing Primary School and (2) near to Newbarns Farm : 3 Jul – 4 Jul – Patching takes place to repair the road surface, it involves removing a part of the surface around a pothole and placing a new patch of road surface. Traffic control (two-way signals)
WithamRoad 3 Jul – 4 Jul – Essex Highways are undertaking works to the roadside gully at this location. Traffic control (two-way signals)
NOTE: There are planned ongoing works along the B1018 through Cressing and on to Witham.
CRESSING PARISH COUNCIL






